IBEK Scaffolding Ltd was contracted to design and install three independent five-level stair towers for the Wildwood residential development project in Ladner, BC, forming the first phase of the site’s comprehensive scaffold plan.
Each tower provided direct and secure access to the roof level, supporting installation crews during the early stages of the retractable roof system build. Constructed with fully engineered components, the towers ensured safe vertical mobility across all levels and maintained load stability across varying work conditions.
This phase represented a coordinated effort between IBEK’s scaffold design, site logistics, and engineering teams, ensuring that all access structures were compliant, efficient, and ready to integrate into the next stages of construction. The result was a robust scaffold access solution that optimized workflow, minimized downtime, and set the foundation for continued progress on the roof system installation.